Serving Whitman County since 1877

3/7/13-Legals

PUBLIC NOTICE

NOTICE IS HEREBY GIVEN in accordance with the Revised Code of Washington, Chapter 36.77.070 that the following projects have been completed by County Forces Construction:

Paul Mader Bridge, C.R.B.P. No. 5320-01.63(2)

This project provided for the replacement of the Paul Mader Bridge with two 80 foot long, 84 inch round culverts for a total cost of $92,812.96.

Zarbach Bridge, C.R.B.P. No. 5190-02.09(2)

This project provided for the replacement of the Zarbach Bridge with a 24 foot wide, 24 foot long prestressed concrete superstructure on a steel substructure for a total cost of $11...

 

Reader Comments(0)